La biblioteca técnica de Megger ofrece acceso a una amplia gama de contenidos y recursos, tales como guías técnicas, notas aplicativas y mucho más. Cuando usted se registra y crea una cuenta Megger, usted podrá entre otras cosas, registrar su producto y tener acceso a una amplia gama de actualizaciones de software y descarga para su productos.

Filtrar por aplicación
    Mostrando artículo/s 1 - 10 de 163 en total
EGIL 200 application example: Classic medium voltage circuit breaker - Static resistance measurement
The requirements for testing a medium voltage circuit breaker vary by customer, meaning there are various test procedures in use by different companies. This application note outlines a common set of tests for a medium voltage circuit breaker and can be used if no other test procedure is available.
Publicado: 14 diciembre 2022
Descargar PDF
EGIL200 application example: Classic medium voltage circuit breaker – Timing measurement
The requirements for testing a medium voltage circuit breaker vary by customer, meaning there are various test procedures in use by different companies. This application note outlines a common test for a medium voltage circuit breaker and can be used if no other test procedure is available.
Publicado: 25 noviembre 2022
Descargar PDF
Directional earth-fault protection - SVERKER 900
The fault current is set to 80mA tosimulatethe high current generated at the intermittent earth fault. The zero voltage is set to 20V;theconfiguration ismade in13 states.The fault states and the first two memory states are set to 20ms. The memory states havetimesselected togetthetrip as close to set time 1,2s as possible. In generator configuration,set U4gen to aux voltage DC.Set “Advanced mode” in SVERKER configuration.
Publicado: 28 abril 2022
Descargar PDF
Case Study on IDAX300 and VAX020
The Power Grid Corporation of India Limited (PGCIL) is an Indian state-owned company headquartered in Gurugram (North India) engaged mainly in Trans-mission  of  Power  and  transmits  about  50%  of  the  total  power  generated  in  India  on  its  transmission  network.  The  company  owns  and  operates  about  1,61,790  circuit  kms  of  transmission  lines  at  800/765 kV,  400 kV,  220 kV  &  132 kV EHVAC and +500 kV HVDC levels and 248 sub-stations. Also, it has the transformation capacity of about 396 825 MVA as of 30th November 2019.
Publicado: 14 febrero 2022
Descargar PDF
Guías de preparación de embarcaciones OTS
Cuando se obtienen resultados inesperados en la prueba de la rigidez dieléctrica de las muestras de aceite, generalmente, se debe a la insuficiente atención a uno o más de los siguientes pasos clave en la preparación de la celda o recipiente de ensayo
Publicado: 25 enero 2022
Descargar PDF
Auxiliary voltage tests of circuit breakers
Measurement of the outer limits of the operating mechanism is required by international standards such IEEE C37 and as IEC 62271, when certifying a circuit breaker (CB). Some of those tests are valuable to repeat in field tests, obviously to ensure that the CB fulfil its design specification, but those tests and some additional tests in similar spirit can also disclose potential future problems. The most common is to vary the auxiliary voltage but it could also be other energy resources for example hydraulic and pneumatic pressure. This application note will focus of the auxiliary voltage, what the standard requires, sort out the terminology and what tests that are valuable to repeat in field tests.
Publicado: 29 noviembre 2021
Descargar PDF
Case study: NB DFR on HV CVTs
Reducing the risk of failure on high voltage instrument transformers in the transmission system using the application of narrowband dielectric frequency response (NB DFR) on HV CVTs.
Publicado: 10 marzo 2021
Descargar PDF
Measuring cable impedance with SVERKER900
This is an easy solution to measure the impedance values for cables, the values are used for calculation of compensation factor in distance protection.The compensation factor is first theoretically calculated and these values can now be compared with the measured values.
Publicado: 14 diciembre 2020
Descargar PDF
Preventive maintenance of rolling stock
The test and maintenance of electrical components on rolling stock is not an easy job to do. Some maintainers dismount some of the parts and bring them to a central location for revision and maintenance. This is a cumbersome and time consuming exercise. In many cases, the electrical parts are replaced only when they break down and are not subject to periodical testing. This of course holds a risk as some parts, e.g. circuit breakers, are crucial for safety reasons.
Publicado: 3 noviembre 2020
Descargar PDF
TTRU3 Factory ratio testing of power transformer
Transformer equipment manufacturers (OEMs) have a critical need to measure true ratio, as they must confirm proper manufacture of their transformers during construction and final assembly. Improper construction has consequences of higher cost, late delivery, and poor quality. The ability of a ratio instrument to be used for all steps involved makes it a practical valueto OEMs because only one instrument is purchased and used throughout each stage. Only the most reliable and accurate instruments make it to the factory floor. Winding stack under constructionre used: Art Mandigo Winding Service.
Publicado: 3 agosto 2020